Enabling the observational method within deep foundation construction at 229 Preston Road, Brighton

-

Presentation Construction/ project delivery

Explore how the observational method was utilised to design out piles and develop a new foundation solution in chalk ground conditions on a residential development in Brighton resulting in savings of £2m and a reduction in the number of piles required.